Fluid type and available environmental records can be important when evaluating a liquid-filled transformer.
Check the nameplate and maintenance files for the stated insulating liquid and any available test history.
Share existing PCB test results or other records if available, including dates and the unit identification.
Disclose observed leaks or damaged containment without opening or sampling the equipment yourself.
Use qualified parties to determine testing, containment, transport and disposal requirements applicable to the specific unit.
Safety first: site personnel must ensure equipment is de-energized and isolated by qualified electrical professionals. Any fluid, environmental, rigging and site requirements are addressed in the agreed scope.